º£½Ç³Ô¹ÏÍø

Skip to main content

Severstal will deliver another batch of pipes for the Yamal LNG project

 

Published by
World º£½Ç³Ô¹ÏÍø,

JSC Severstal Distribution (included in the division Severstal Russian Steel) has announced it will ship in December approximately 3000 t of pipes produced by LLC Severstal TPZ Sheksna for Yamal LNG.

Severstal TPZ Sheksna produce products with diameters from 159 mm to 325 mm in thickness 5 - 8 mm. The length of the tubes, unlike the previous batch, when produced 16 m pipes, standard - 12 m.

The pipes are made of low-alloy, structural steel 09G2S.

Total in 2015 TPZ Sheksna will produce for the project Yamal LNG about 8000 t of pipes.

Edited from press release by